Salihli OIZ

Electricity Distribution

Environment Operation and maintenance of the lighting electricity network,
- Operation of the in-region MV electricity distribution network to provide 24-hour service,

Operation of -2 154/33kV Substations,

- Elimination of malfunctions that occur,
- Examining the MV energy requests of the participating companies and granting energy permits,
- Preparation of MOSB electricity sales contracts,
- Commissioning of the assembled facilities,

Salihli OIZ

Steam and Hot Water Distribution

Steam and hot water, which are by-products of our power plant, are offered to the service of our industrialists in the region. Depending on the demands of existing and potential companies operating in the region, steam and hot water lines are designed. The line investment cost is covered by our Region and the demands of the companies are met.

The steam demand of 15 companies in our region is met by 12,200 m. long steam and condensate lines established and operated by our region and 650,000 tons of steam is sold annually.

Salihli OIZ

Waste Water Treatment Plant Management

Our Wastewater Treatment Plant, built in 1993 with a capacity of 6,500 m³/day and built in 2001 with a capacity of 15,000 m3/day, which treats domestic and industrial wastewater originating from our region, continues its actual treatment activities uninterruptedly until today.

Built on an area of 51,460 m² and with a total capacity of 21,500 m³/day, the Wastewater Treatment Plant is capable of meeting the treatment needs of the companies operating throughout the region.

The sludge cake from the sludge dewatering unit in our treatment plant is transferred to licensed companies for disposal.

On the other hand, in parallel with the growth and development in our region, the need to increase the capacity of the existing facility has arisen, taking into account the increasing wastewater flow and pollution loads over time. In this context, the construction of an additional wastewater facility with a capacity of 20,000m³/day in the Technical Infrastructure Area of 73,877.56m² in Section VI of our Region is ongoing.

Salihli OIZ

Zero Waste Management

Our region has received Zero Waste Certificate and provides the necessary coordination and cooperation for the planning of zero waste management system, establishment of necessary infrastructures, implementation and monitoring of the system within the borders of our region. We have 2 collection centers within the borders of our region.

Salihli OIZ

Municipal Solid Waste Management

Domestic solid wastes originating from the companies in our region and collected in waste collection containers are collected, transported and disposed of by the domestic solid waste transportation vehicles of our region and delivered to the disposal facility.

Salihli OIZ

Recycling Waste Management

Paper-cardboard, plastic, glass, metal, wood, etc. wastes generated by our Zone and its subsidiaries are collected from waste collection areas or waste collection centers by our Zone personnel and delivered to licensed enterprises.

Salihli OIZ

Hazardous Waste and Other Industrial Waste

Paper-cardboard, plastic, glass, metal, wood, etc. wastes generated by our Zone and its subsidiaries are collected from waste collection areas or waste collection centers by our Zone personnel and delivered to licensed enterprises.

Salihli OIZ

Domestic Water Infrastructure System Management

The domestic water needs of the companies in our region are supplied by our region, delivered to our water tanks with our transmission line and disinfected and delivered to our companies with our domestic water infrastructure system. Our disinfection quality of domestic water is controlled by taking samples every day. In addition, control monitoring is carried out by taking samples 4 times a month in the Public Health Laboratory and comprehensive audit analysis is carried out once a year.

Salihli OIZ

Process and Irrigation Water Infrastructure System Management

We have approximately 50 km of process and irrigation water infrastructures that are needed for the use of the reclaimed water obtained by advanced treatment of the discharge water of our Wastewater Treatment Plants in the process water and green areas of our companies.

Salihli OIZ

Waste Water Infrastructure System Management

Our wastewater and stormwater infrastructures are separate systems, and domestic and industrial wastewater generated from the operating facilities are transmitted to our Wastewater Treatment Plants through the wastewater infrastructure network of our Region and discharged to the receiving environment after treatment.

Salihli OIZ

Storm Water Infrastructure System Management

All rainwater collected within the borders of our region is discharged to Safran Stream, Karaçay Stream, Boncuk and Çapaçarık Streams passing through the borders of our region through the rainwater infrastructure network of our region and finally reaches the Gediz River.

Salihli OIZ

Training and Conference Hall

Companies in the region can also benefit from the 60-seat training hall and 130-seat conference hall, which are suitable for holding all kinds of meetings, training, information and other activities in the region.
Salihli OIZ

Banks and ATMs

All kinds of banking services are provided at Akbank Bank branches located in the Salihli Organized Industrial Zone campus area. In addition, ATMs belonging to various banks serve at different points of the region.

Salihli OIZ

Cafe, Restaurants & Markets